Whitewater Run WV Class I-II

2. Bloomery Bridge Boat Ramp to Millville, WV

American Whitewater
Linked via: Proximity 99% confidence Synced 6mo ago
Gauge Conditions
Runnable: 1.7 – 8.0 FT
Run Map
Run Time Estimate
Select put-in and take-out to estimate time.
Sign in to generate an AI timing estimate for this run.
Whitewater timing varies with scouting, portages, and group pace. Use as a planning baseline.
Description
From the Bloomery Bridge Boat Ramp there is flat/moving water for about a mile, then a rapid (Class II, but perhaps III at higher levels), then a pool above a Dam.  The Dam must be portaged (river left) and then some additional Class II rapids and moving water down to Millville, WV

Hazards & Portages (1)

Caution: The following locations may require scouting or portaging. Always check current conditions.
Difficulty
Class I-II
Length
4.6 mi
Gradient
10 ft/mi
Rapids
2
1 Portage
Difficulty Classes
I Easy II Novice III Intermediate IV Advanced V Expert/Extreme VI Unrunnable
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater