Sign in to generate an AI timing estimate for this run.
Whitewater timing varies with scouting, portages, and group pace. Use as a planning baseline.
Description
Typical put-in for the class II stretch at the FR 7010 bridge (4 miles
from this point to take-out). Some class IV drops upstream between FR
7030 and 7010 bridge, but there could be lots of logs (see Bennett).
Logistics
The take-out for this section is in Greenwater where Highway 410 crosses the river at road mile 42.7.
To reach the put-in, head south on Highway 410 to mile 44.8 and then turn east onto FR 70. Head up
this road to the FR 7010 Bridge and the put-in.
Lat/Longitude data are _very_ approximate.