Whitewater Run CA Class I

French Meadows Dam to Interbay

American Whitewater
Linked via: Unknown Synced 6mo ago
Gauge Conditions
Runnable: ? – ? CFS
Approximate reading: This gauge is 0.4 miles away on American. Use as a general reference only.
CDEC Flow Data California
AMERICAN RIVER OXB Primary
Elevation: 1,070 ft
Elevation: 6,410 ft
AMERICAN RIVER BIL Dam Release
Elevation: 6,400 ft
AMERICAN RIVER RBL Dam Release
Elevation: 6,800 ft
AMERICAN RIVER JNC Dam Release
Elevation: 4,468 ft
Run Map
Run Time Estimate
Select put-in and take-out to estimate time.
Sign in to generate an AI timing estimate for this run.
Whitewater timing varies with scouting, portages, and group pace. Use as a planning baseline.
Description
This section has been run very little because of the lack of flows and flow information. It a spring melt run and is reported to be a high quality canyon.
Difficulty
Class I
Length
11.0 mi
Rapids
0
Difficulty Classes
I Easy II Novice III Intermediate IV Advanced V Expert/Extreme VI Unrunnable
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater