Hazard Warning: Hazard information may be user-submitted and unverified. Conditions change frequently. Always scout rapids and obstacles yourself.
Put-in CO

Put In

Colorado - 07. Shoshone Power Plant, Exit 123 (I-70) to Grizzly Creek, Exit 121 (I-70) (CO)

Gauge Conditions
Runnable: 500.0 – 10,000.0 CFS

Optimal flow range (Flows based on 2012 WFET Basin Report).

Photo
Put In
Photo courtesy of American Whitewater
Description
Put In rapid serves as the entry point for this section of the Colorado River, marking the start of the run below Shoshone Power Plant. The rapid offers a relatively straightforward entry into the river, with minimal technical challenges but potential for swift current and potential hydraulic features depending on water levels. Paddlers should scout the entry and be prepared for potential debris or variations in flow near the put-in zone.
Location
Type
Put-in
Difficulty
Class N/A
Mile Marker
0.0 mi
Directions
View Full Run
07. Shoshone Power Plant, Exit 123 (I-70) to Grizzly Creek, Exit 121 (I-70)
Colorado
III-IV 1.7 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater