Put In rapid marks the starting point for this river section, offering paddlers an immediate transition from flatwater to moving current. The entry point requires careful navigation through a narrow channel with potential for submerged rocks and variable water levels. Paddlers should scout the put-in carefully and be prepared for potential tight maneuvering at the section's start.