Hazard Warning: Hazard information may be user-submitted and unverified. Conditions change frequently. Always scout rapids and obstacles yourself.
Put-in PA

Put In - Lisburn (PA 114 bridge)

Yellow Breeches - 3. Lisburn (PA 114 bridge) to Spanglers Mill Rd. (PA)

Gauge Conditions
Runnable: 1.4 – 6.0 FT
Photo
Put In - Lisburn (PA 114 bridge)
Photo courtesy of American Whitewater
Description
The Put In at Lisburn serves as a key access point for the Yellow Breeches River section between PA 114 bridge and Spanglers Mill Road. While specific rapid details are limited, the bridge provides a straightforward entry for paddlers looking to navigate this river segment, with standard river entry considerations like current flow, water level, and potential obstacles at the put-in.
Location
Type
Put-in
Difficulty
Class N/A
Mile Marker
0.0 mi
Directions
View Full Run
3. Lisburn (PA 114 bridge) to Spanglers Mill Rd.
Yellow Breeches
I 7.8 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater