Take-out
NH
Take Out
Save this feature with the run it belongs to.
Gauge Conditions
Data from American Whitewater & USGS
Photo
Photo courtesy of American Whitewater
Description
Take Out is a transition rapid marking the end of the Upper Piscataquog run, characterized by a complex boulder garden with multiple potential lines. Paddlers should be prepared for tight maneuvering between rocks and potential pin hazards, especially at lower water levels. The rapid requires careful route selection and precise boat control to navigate successfully.
Location
Interactive river map
Loads as you approach this section.
Other Rapids on This Run (3)
View Full Run
1) Upper—Francestown to New Boston
Piscataquog, South Branch
II-III(IV)
7.7 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater
American Whitewater