Put-in
VT
Power plant put in (Class II-III)
Save this feature with the run it belongs to.
Gauge Conditions
Runnable: 500.0 – 2,000.0 CFS
Min and max runnability levels are not known. All we know is that 650 cfs is runnable. If you know good levels, please help out by adding a comment.
Data from American Whitewater & USGS
Photo
Photo courtesy of American Whitewater
Description
Power Plant Put In features a straightforward entry with moderate technical challenges, characterized by scattered mid-stream boulders and potential pocket waves that require precise boat positioning. Paddlers should be prepared for potential route-finding through rock gardens and maintain awareness of potential hydraulic features near the river's center, with the most reliable line typically running closer to river right.
Location
Interactive river map
Loads as you approach this section.
View Full Run
5 Mile Square Rd to Clyde Road
Clyde
II-III(V)
23.0 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater
American Whitewater