Hazard Warning: Hazard information may be user-submitted and unverified. Conditions change frequently. Always scout rapids and obstacles yourself.
Put-in VT

Power plant put in (Class II-III)

American Whitewater 44.9374, -72.1808

Save this feature with the run it belongs to.

Gauge Conditions

Clyde River at Newport, VT Downstream Primary
Runnable: 500.0 – 2,000.0 CFS

Min and max runnability levels are not known. All we know is that 650 cfs is runnable. If you know good levels, please help out by adding a comment.

Photo

Power plant put in (Class II-III)
Photo courtesy of American Whitewater

Description

Power Plant Put In features a straightforward entry with moderate technical challenges, characterized by scattered mid-stream boulders and potential pocket waves that require precise boat positioning. Paddlers should be prepared for potential route-finding through rock gardens and maintain awareness of potential hydraulic features near the river's center, with the most reliable line typically running closer to river right.

Location

Interactive river map Loads as you approach this section.
Type
Put-in
Difficulty
Class N/A
Mile Marker
22.6 mi
Directions
View Full Run
5 Mile Square Rd to Clyde Road
Clyde
II-III(V) 23.0 mi

Current Conditions

5-Day Forecast

Whitewater data from
American Whitewater