Put-in
WI
Put In
Save this feature with the run it belongs to.
Gauge Conditions
Runnable: ? – ? CFS
Approximate - nearest available gauge. Use as general reference only.
Data from American Whitewater & USGS
Photo
Photo courtesy of American Whitewater
Description
Put In rapid on the Peshtigo River's Burnt Bridge section is a straightforward entry point with minimal technical challenges. The rapid offers a clean put-in with moderate current and some small boulder obstacles that require basic maneuvering skills. Paddlers should be aware of potential shallow areas and scout water levels before launching, as river conditions can vary significantly with seasonal flows.
Location
Interactive river map
Loads as you approach this section.
View Full Run
B) Burnt Bridge (FS2134) to Goodman Park Rd (FS 2136) (6.1 miles)
Peshtigo
I-II+(III)
6.2 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater
American Whitewater