Save this feature with the run it belongs to.
Low water, but still worthwhile.
This access point is located on river left just upstream of the Sandstone Bridge. American Whitewater worked to formalize this site as a condition of the Clackamas Hydroelectric Project. The facility was developed and is maintained by Portland General Electric as a condition of their hydropower license.
Rapid
III
Rapid
III
Rapid
III
Rapid
N/A
Rapid
III
Rapid
N/A
Rapid
II
Rapid
II
Rapid
III
Rapid
II
Rapid
III
Rapid
N/A
Rapid
III
Rapid
N/A
Rapid
N/A