Hazard Warning: Hazard information may be user-submitted and unverified. Conditions change frequently. Always scout rapids and obstacles yourself.
Rapid MI

Hwy.41 / USGS site / Alternate put-in/take-out

Rock - Worm Lake outlet to Sturgeon River (9.1 miles) (MI)

Gauge Conditions
Runnable: 500.0 – 2,000.0 CFS

Likely too low. (~0-125 cfs)

Description

USGS lists a sampling site at Hwy.41 with drainage area at this point of 40.3 square miles.

While one could shorten the trip by 2+ miles by putting in here, we generally recommend using the upper put-in (as listed on this reach). It gives boaters (especially those who may be less familiar with the run) a chance to 'warm up' and see what the run is like.

If you have any difficulty or concern running the upper part of the run (down to this location), you should seriously consider taking out here. The run from here down steps things up a notch or two.

Location
Type
Rapid
Difficulty
Class N/A
Mile Marker
2.1 mi
Directions
View Full Run
Worm Lake outlet to Sturgeon River (9.1 miles)
Rock
II-III+ 8.3 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater