Put-in
CA
Mouth of Willow Creek
Save this feature with the run it belongs to.
Gauge Conditions
Runnable: ? – ? CFS
Approximate - nearest available gauge. Use as general reference only.
Data from American Whitewater & USGS
CDEC Flow Data California
Data from California Data Exchange Center (CDEC)
Description
This was the standard put-in location to use before the official parking area and put in trail were constructed. When Willow Creek has enough flow, kayakers can launch into the creek at the road bridge and boat the .35 of a mile to the river. It can be very brushy.
There is usually a thick growth of bushes across the main river downstream of Willow Creek. They grow in the shallow sediment that gets carried down Willow Creek and deposited in the relatively wide and slow main river channel.
Location
Interactive river map
Loads as you approach this section.
Other Rapids on This Run (20)
Rapid
N/A
Redinger Dam
Rapid
N/A
Gauge Trail Put-in
Rapid
V
Redinger Gorge
Rapid
N/A
Official Put in and Parking
Rapid
N/A
Auquaduct Parking
Rapid
N/A
Staff Gage
Rapid
IV
Study rapid
Rapid
III
Scenic Corridor
Rapid
III+
Two Holes Hiding
Rapid
III
Rapid
Rapid
IV
Long and Shallow
Rapid
N/A
Backbone Creek
Rapid
IV
Four Holes
Rapid
IV
Little Dog
Rapid
V
Big Dog
Rapid
III+
Wa Hoo!
Rapid
III+
Constriction
Rapid
III
Soul Surfer
Hazard
III+
Powerhouse Hole
Rapid
II
Big Creek #4 Powerhouse
View Full Run
3. Horseshoe Bend (Redinger Dam to Kerckhoff Reservoir)
San Joaquin
III-IV(V)
7.0 mi
Current Conditions
5-Day Forecast
Whitewater data from
American Whitewater
American Whitewater